Expert Installation. Standards-Compliant. UAE-Ready.
At Sava Safety Showers, we provide expert installation services for emergency safety equipment across the UAE. Whether you’re fitting a new facility, upgrading outdated systems, or expanding into hazardous areas, our trained field engineers ensure your safety showers, eye wash stations, and decontamination units are installed correctly, compliantly, and ready to perform.
Every installation is aligned with ANSI Z358.1 and EN 15154 standards—because proper installation is the foundation of long-term equipment reliability and regulatory compliance.
UAE-Based Field Engineering Team
From the oil fields of Abu Dhabi to the industrial zones of Dubai and the ports of Sharjah, our locally based technicians install emergency equipment with precision and speed. Our team understands the region’s climate, water quality, infrastructure variances, and regulatory environments—ensuring every job is handled with regional expertise.
We handle site surveys, installation planning, commissioning, and post-installation training as part of our turnkey delivery model.


What We Install


We install emergency safety systems of all types and configurations:
Indoor & Outdoor Emergency Showers
Eye and Face Wash Stations
Overhead Tank Showers
Mobile Decontamination Units
Temperature-Controlled Emergency Tanks
Cubicle Showers & Enclosed Systems
Accessories: signs, alarms, foot pedals, thermostatic mixing valves, and more
Standards-Based Installation Procedures
Each installation is carried out in compliance with the key international standards for emergency equipment:


EN 15154-2:2006
Ergonomic and safe activation systems
Spray pattern and coverage testing
Flow rate and temperature control
Performance in ambient and extreme temperatures
ANSI/ISEA Z358.1-2014
Positioning of units within 10 seconds (approx. 15m) from hazards
Unobstructed access with clear visibility
Minimum 20 gallons per minute (GPM) for showers; 0.4 GPM for eye washes
Tepid water delivery: 16–38°C (60–100°F)
Installation Phase Checklist
Mounting & Positioning
Level and secure anchoring of shower/eye wash unit
Obstruction-free access routes
Clear, weatherproof signage installed
System Commissioning
Flow-rate verification using calibrated gauges
Water temperature tested and balanced
Activation mechanisms tested for ease and response
Site Readiness
Confirm drainage availability and floor gradient
Check water supply pressure and flow capacity
Verify proximity to hazard zone (10 seconds max)
(With Future Maintenance in Mind)
To avoid post-installation issues and to ease future servicing, we follow a comprehensive checklist:
Compliance Documentation
Installation report with ANSI/EN references
Initial maintenance and inspection guidelines issued
Optional: photo log and commissioning checklist
Post-Installation Support
Once your system is operational, we provide:
User training for on-site personnel
Digital documentation for your HSE compliance records
A transition path into our inspection & maintenance program
We Install Equipment from All Brands
While Sava designs and manufactures its own range of emergency safety equipment, we also install and commission units from leading international suppliers. Whether it’s a Hughes or Haws system or another OEM, our team ensures everything works as intended.
Book a Site Survey
Planning a new installation? Our field team is ready.
Let’s install your safety solution the right way—first time, every time.
Built for Urgency. Engineered for Reliability. Trusted Across the UAE.
contact@Sava-safety.com
+971-555-1234
© 2025. All rights reserved.
